74 Pieces In. 24 Planned Trucks Out.
Turn the project spreadsheet into the trucks it actually takes — with a plan behind the number your team can review and defend.
See How Load Planning WorksManufactured Homes and Manufactured Storage Buildings Annual Permit
M.S. 169.86 subd. 5(d)(3)
This Permit is required for new and used mobile homes. Storage sheds are allowed with this permit type.
Maximum limits:
Fee: $120
Route Approval Required? Yes
Source of information: https://www.revisor.mn.gov/statutes/cite/169.86#stat.169.86.5
https://www.dot.state.mn.us/cvo/oversize/pdf/permittypesfees.pdf
Calculate Oversize/Overweight Load Regulations and Prices Instantly with Oversize.io