"OVERSIZE LOAD": Warning signs are required on the front and back of all oversize loads. Size: 7' long, 18" high Letters Black, 10" high, 1.5" brushstroke Background: yellow
All Oversize Loads: All flags shall be 18" square clean bright red flags on all four corners of the extremities of over width objects, and at the extreme ends of all protrusions, projections, or overhangs.
During reduced visibilities (inclement weather): Two (2) amber lights, visible from front and sides, must be attached at the widest points on the front. If the over width part is at or near the rear of the vehicle, this light may be red and visible from front, side and rear. On rear overhangs more than 4', 2 red lights [1 on each side] and 2 red reflectors must be visible from the rear, must indicate maximum width of the overlength or projecting part. If the overlength or projecting part is two (2) feet wide or less, one (1) red light and one (1) red reflector is sufficient.
http://perba.dotd.louisiana.gov/welcome.nsf/RegBook2013.pdf
"Dimensions: Width: 8' 6" Height: 14' Length: Any vehicle or combination: 65' Legal Overhang: Front: 4', Rear 8'.
Louisiana Oversize / Overweight Permit Regulations
Washington Oversize Load Flags, Lights, Banners, Running Hours and Holiday Restrictions
Arkansas Oversize Load Flags, Lights, Banners, Running Hours and Holiday Restrictions
Nevada Oversize Load Flags, Lights, Banners, Running Hours and Holiday Restrictions
Yukon Oversize Load Flags, Lights, Banners, Running Hours and Holiday Restrictions