Simplify Your Oversize/Overweight Loads
Multitrip permits up to 12 months in duration may be issued to transport indivisible loads on specified highways to an alternative energy construction site or staging area for alternative energy transportation. These vehicles are allowed up to 256,000 lbs. gross vehicle weight but must adhere to single axle limits of 20,000 lbs. each. The permit-issuing authority may include other restrictions or require special considerations before issuing the permit (Iowa Code Ann. §321E.9B).
Dimensions:
Cost:
Overweight/Oversize (non-reducible) annual permit fee for 12 consecutive months - $128 plus quarterly mileage reports;
Oversize annual permit - $43
Time, it takes to receive: 1 business day
Mailing method: Online/emailed
Commodity specific? Truck specific
Need to obtain a route? No
Source of information: https://itd.idaho.gov//wp-content/uploads/2018/02/Permit_Manual.pdf
Calculate Oversize/Overweight Load Regulations and Prices Instantly with Oversize.io