Quoting the Load These Rules Apply To?

Load planning turns a project piece list into a truck-by-truck plan and prices the permits, escorts, and accessorials for every state on the route — you just add your truck rates.

See How Load Planning Works

Kansas Oversize Annual Permit | Oversize Overweight Load Annual Permits

ANNUAL PERMIT 


Maximum Dimensions: 

  • Width: 16' 6” 
  • Height: Based on bridge/structure clearances 
  • Length: 126’ 

Cost: Annual Permit - $ 150

Time, it takes to receive: 1 business day

Mailing method: Online/emailed

Commodity specific? Truck specific

Need to obtain a route? Yes


Source of information: https://www.ksdot.org/permit_links.asp 

Calculate Oversize/Overweight Load Regulations and Prices Instantly with Oversize.io