74 Pieces In. 24 Planned Trucks Out.
Turn the project spreadsheet into the trucks it actually takes — with a plan behind the number your team can review and defend.
See How Load Planning WorksExact limits are not stated. If the dimensions exceed normal single trip permit limitations then a manual review will be required. During this review additional measures can be implemented to ensure safe passage of the shipment.