74 Pieces In. 24 Planned Trucks Out.
Turn the project spreadsheet into the trucks it actually takes — with a plan behind the number your team can review and defend.
See How Load Planning WorksNo public information found on annual permits in Nova Scotia.
A Special Move Permit is required because the Nova Scotia roadway system is designed to accommodate vehicles of certain standard sizes and dimensions. As a result, restrictions are applied for oversized moves greater than 2.6 metres in width, or 4.15 metres in height or 23 metres and varying weights depending on axle configuration.
Calculate Oversize/Overweight Load Regulations and Prices Instantly with Oversize.io